Project Details
-
Client
General Dynamics Electric Boat -
Service
Construction Management -
Location
Groton, CT
Electric Boat engaged A/Z to coordinate the construction of a new small scale test laboratory within the active and highly secure Building 4 on their Groton, CT campus. The laboratory plays a critical role in EB’s R&D operations by allowing scaled-down versions of electric propulsion systems to be tested in a controlled environment. The project began with the demolition of the existing space, which included the abatement of asbestos sound dampening tiles. New walls and ceilings were installed along with the mechanical and electrical systems that would be needed to power EB’s proprietary testing equipment. Once finished, the space was fully prepared for EB personnel to move in their equipment and begin testing operations.